 
Extreme Makeover: Eglin Edition
These images show the Poquito Bayou Housing Area kitchens before and after the current renovation. The 96th Civil Engineer Group will be renovating 435 kitchens in Capehart and Poquito Housing Areas and 145 bathrooms in Poquito Housing Area over the next year. (U.S. Air Force photo illustration/Samuel King Jr.)
|
Extreme ...
Download Full Image E-mail a friend
Posted: 9/7/2012
|
|
|
 
Extreme Makeover: Eglin Edition
These images show the Poquito Bayou Housing Area bathrooms before and after the current renovation. The 96th Civil Engineer Group will be renovating 435 kitchens in Capehart and Poquito Housing Areas and 145 bathrooms in Poquito Housing Area over the next year. (U.S. Air Force photo illustration/Samuel King Jr.)
|
Extreme ...
Download Full Image E-mail a friend
Posted: 9/7/2012
|
|
|
 
Work horses
The Red Hats of the 823rd Red Horse Squadron spread out the asphalt that the paver puts down at the Combat Shield compound at Eglin Air Force Base, Fla., June 20. The two-month paving project by the Hulburt Field Airmen changed the layout of the roads in and out of the compound to allow for large haulers to maneuver and exit with ease. (U.S. Air Force photo/Samuel King Jr.)
|
Work horses
Download Full Image E-mail a friend
Posted: 6/26/2012
|
|
|
 
Work horses
The Red Hats of the 823rd Red Horse Squadron scoop up asphalt at the Combat Shield compound at Eglin Air Force Base, Fla., June 20. The two-month paving project by the Hulburt Field Airmen changed the layout of the roads in and out of the compound to allow for large haulers to maneuver and exit with ease. (U.S. Air Force photo/Samuel King Jr.)
|
Work horses
Download Full Image E-mail a friend
Posted: 6/26/2012
|
|
|
 
Work horses
Airman 1st Class Anthony Abreu, of the 823rd Red Horse Squadron, tosses a shovel-full of asphalt back into the paver June 20 at Eglin Air Force Base, Fla. The two-month paving project of the Combat Shield compound was a redesign of the roads in and out of the compound to allow for large haulers to maneuver and exit with ease. Most of the planning and all of the labor were performed by Red Horse Airmen. (U.S. Air Force photo/Samuel King Jr.)
|
Work horses
Download Full Image E-mail a friend
Posted: 6/26/2012
|
|
|
 
Work horses
The Red Hats of the 823rd Red Horse Squadron spread out the newly poured asphalt at the Combat Shield compound at Eglin Air Force Base, Fla., June 20. The two-month paving project by the Hulburt Field Airmen changed the layout of the roads in and out of the compound to allow for large haulers to maneuver and exit with ease. (U.S. Air Force photo/Samuel King Jr.)
|
Work horses
Download Full Image E-mail a friend
Posted: 6/26/2012
|
|
|
 
Out with the old
A general contractor team, working in conjunction with the U.S. Army Corp of Engineers and base civil engineers, uses an excavator to demolish a fuel cell maintenance hangar, Dec. 15 at Eglin Air Force Base, Fla. The hangar was used in the 1960s for B-52s stationed here prior to the 33d Fighter Wing being established. It was used for F-15s until the wing transitioned from Air Combat Command to Air Education and Training Command in October 2009. Replacing it will be an F-35 fuel cell maintenance hangar with three aircraft bays, office space and a tool crib. It is anticipated for completion in Feb. 2013. (U.S. Air Force photo/Maj. Karen Roganov)
|
Out with the old
Download Full Image E-mail a friend
Posted: 12/16/2011
|
|
|
 
Old tower
Workers begin to move Duke Field’s old air traffic control tower toward a flat bed truck after it was taken down Dec. 3. The tower, managed by the 46th Test Wing, was continuously used in guiding in aircraft at Duke Field since the 1950s. It was replaced with a new tower this year. (U.S. Air Force photo/Samuel King Jr.)
|
Old tower
Download Full Image E-mail a friend
Posted: 12/7/2011
|
|
|
 
Two towers
Just behind its new tower, Duke Field’s old air traffic control tower is lowered to the ground Dec. 3. The tower, managed by the 46th Test Wing, was continuously used in guiding in aircraft at Duke Field since the 1950s. (U.S. Air Force photo/Samuel King Jr.)
|
Two towers
Download Full Image E-mail a friend
Posted: 12/7/2011
|
|
|
 
Cut thru
A welder cuts through a beam holding up the air traffic control tower at Duke Field Dec. 3. The tower, managed by the 46th Test Wing, was continuously used in guiding in aircraft at Duke Field since the 1950s. It was replaced with a new tower this year. (U.S. Air Force photo/Samuel King Jr.)
|
Cut thru
Download Full Image E-mail a friend
Posted: 12/7/2011
|
|
|
 
Out with the old
Col. Sal Nodjomian, 96th Air Base Wing commander, breaks down the entry way to the old Eglin Air Force Base NCO club Oct. 15. The club will be completely removed by mid-November to make way for Navy EOD dormitories. The dorms are scheduled to be complete by Summer 2011. (U.S. Air Force photo/Samuel King Jr.)
|
Out with the old
Download Full Image E-mail a friend
Posted: 10/18/2010
|
|
|
 
Staff excavator
Col. Sal Nodjomian, 96th Air Base Wing commander, drives the excavator toward the old Eglin Air Force Base NCO club prior to kicking off its demolition Oct. 15. The club will be completely removed by mid-November to make way for Navy EOD dormitories. The dorms are scheduled to be complete by Summer 2011. (U.S. Air Force photo/Samuel King Jr.)
|
Staff excavator
Download Full Image E-mail a friend
Posted: 10/18/2010
|
|
|
 
Moving in
Tech. Sgt. Steve Welch, 96th Communications Squadron, begins to install the command post's giant voice system at their new location in Building 1. The command post serves as the executive agency for command and control for commanders during routine operations, emergencies, contingencies and increased readiness. The CP is a 24 hour a day, seven days a week operation that has 17 authorizations to man its shifts. (U.S. Air Force photo/Samuel King Jr.)
|
Moving in
Download Full Image E-mail a friend
Posted: 9/21/2010
|
|
|
 
Runway clear
A line of asphalt was cleared by the RX-900 in February at Eglin Air Force Base, Fla. This was part of the six-month repaving and construction on Runway 19/01. The runway reopened March 15 to air traffic. (Courtesy photo.)
|
Runway clear
Download Full Image E-mail a friend
Posted: 3/15/2010
|
|
|
 
Road rash
Asphalt is ground up and shot out by the RX-900 in February at Eglin Air Force Base, Fla. This was part of the six-month repaving and construction on Runway 19/01. The runway reopened March 15 to air traffic. (Courtesy photo.)
|
Road rash
Download Full Image E-mail a friend
Posted: 3/15/2010
|
|
|
 
Road rash
Asphalt is ground up and shot out by the RX-900 in February at Eglin Air Force Base, Fla. This was part of the six-month repaving and construction on Runway 19/01. The runway reopened March 15 to air traffic. (Courtesy photo.)
|
Road rash
Download Full Image E-mail a friend
Posted: 3/15/2010
|
|
|
 
Blue steel
EGLIN AIR FORCE BASE, Fla. -- A construction worker welds the steel frame of the Eglin Conference Center walkway canopy, Feb. 24. The canopy will receive repairs before it is recovered. (U.S. Air Force photo/ Airman 1st Class Anthony Jennings)
|
Blue steel
Download Full Image E-mail a friend
Posted: 2/24/2010
|
|
|
 
Blue steel
EGLIN AIR FORCE BASE, Fla. -- A construction worker welds the steel frame of the Eglin Conference Center walkway canopy, Feb. 24. The canopy will receive repairs before it is recovered. (U.S. Air Force photo/ Airman 1st Class Anthony Jennings)
|
Blue steel
Download Full Image E-mail a friend
Posted: 2/24/2010
|
|
|
 
Cutting Up
EGLIN AIR FORCE BASE, Fla. -- A construction worker cuts into the sidewalk next to Dorm 17, Feb. 24. The work will repair cracks and uneven areas of the sidewalk to improve the quality of life for personnel walking on base. (U.S. Air Force photo/ Airman 1st Class Anthony Jennings)
|
Cutting Up
Download Full Image E-mail a friend
Posted: 2/24/2010
|
|
|
|
 
Sparks fly
Sparks fly as a construction worker cuts through a piece of metal Jan. 8 at the Joint Strike Fighter Training Facility construction site. The temperatures and wind chill halted some of the construction activities Jan. 8, but work still continued. Drills, saws, raised platforms and heavy movers could be heard all around the site. (U.S. Air Force photo/Samuel King Jr.)
|
Sparks fly
Download Full Image E-mail a friend
Posted: 1/11/2010
|
|
|
 
Chiller driller
A construction worker, on a raised lift, uses a drill on the right side of the Joint Strike Fighter Training Facility construction site Jan. 8. The temperatures and wind chill halted some of the construction activities Jan. 8, but work still continued. Drills, saws, raised lifts and heavy movers could be heard all around the site. (U.S. Air Force photo/Samuel King Jr.)
|
Chiller driller
Download Full Image E-mail a friend
Posted: 1/11/2010
|
|
|
 
The flame
A construction worker adjusts a blowtorch before soldering Jan. 8 at the Joint Strike Fighter Training Facility construction site. The temperatures and wind chill halted some of the construction activities Jan. 8, but work still continued. Drills, saws, raised platforms and heavy movers could be heard all around the site. (U.S. Air Force photo/Samuel King Jr.)
|
The flame
Download Full Image E-mail a friend
Posted: 1/11/2010
|
|
|
 
Maker's mark
John Luciano marks a pipe with a marker Jan. 8 at the Joint Strike Fighter Training Facility construction site. The temperatures and wind chill halted some of the construction activities Jan. 8, but work still continued. Drills, saws, raised lifts and heavy movers could be heard all around the site. (U.S. Air Force photo/Samuel King Jr.)
|
Maker's mark
Download Full Image E-mail a friend
Posted: 1/11/2010
|
|
|
| | | |