Eglin Air Force Base   Right Corner Banner
Join the Air Force

Photos > Media Gallery
Selected : Construction

48 Result(s) Found

Show 12 24 48
 

Extreme Makeover: Eglin Edition

These images show the Poquito Bayou Housing Area kitchens before and after the current renovation. The 96th Civil Engineer Group will be renovating 435 kitchens in Capehart and Poquito Housing Areas and 145 bathrooms in Poquito Housing Area over the next year. (U.S. Air Force photo illustration/Samuel King Jr.)
Extreme ...


Download Full Image
E-mail a friend
Posted: 9/7/2012


Extreme Makeover: Eglin Edition

These images show the Poquito Bayou Housing Area bathrooms before and after the current renovation. The 96th Civil Engineer Group will be renovating 435 kitchens in Capehart and Poquito Housing Areas and 145 bathrooms in Poquito Housing Area over the next year. (U.S. Air Force photo illustration/Samuel King Jr.)
Extreme ...


Download Full Image
E-mail a friend
Posted: 9/7/2012


Work horses

The Red Hats of the 823rd Red Horse Squadron spread out the asphalt that the paver puts down at the Combat Shield compound at Eglin Air Force Base, Fla., June 20. The two-month paving project by the Hulburt Field Airmen changed the layout of the roads in and out of the compound to allow for large haulers to maneuver and exit with ease. (U.S. Air Force photo/Samuel King Jr.)
Work horses


Download Full Image
E-mail a friend
Posted: 6/26/2012


Work horses

The Red Hats of the 823rd Red Horse Squadron scoop up asphalt at the Combat Shield compound at Eglin Air Force Base, Fla., June 20. The two-month paving project by the Hulburt Field Airmen changed the layout of the roads in and out of the compound to allow for large haulers to maneuver and exit with ease. (U.S. Air Force photo/Samuel King Jr.)
Work horses


Download Full Image
E-mail a friend
Posted: 6/26/2012


Work horses

Airman 1st Class Anthony Abreu, of the 823rd Red Horse Squadron, tosses a shovel-full of asphalt back into the paver June 20 at Eglin Air Force Base, Fla. The two-month paving project of the Combat Shield compound was a redesign of the roads in and out of the compound to allow for large haulers to maneuver and exit with ease. Most of the planning and all of the labor were performed by Red Horse Airmen. (U.S. Air Force photo/Samuel King Jr.)
Work horses


Download Full Image
E-mail a friend
Posted: 6/26/2012


Work horses

The Red Hats of the 823rd Red Horse Squadron spread out the newly poured asphalt at the Combat Shield compound at Eglin Air Force Base, Fla., June 20. The two-month paving project by the Hulburt Field Airmen changed the layout of the roads in and out of the compound to allow for large haulers to maneuver and exit with ease. (U.S. Air Force photo/Samuel King Jr.)
Work horses


Download Full Image
E-mail a friend
Posted: 6/26/2012


Out with the old

A general contractor team, working in conjunction with the U.S. Army Corp of Engineers and base civil engineers, uses an excavator to demolish a fuel cell maintenance hangar, Dec. 15 at Eglin Air Force Base, Fla. The hangar was used in the 1960s for B-52s stationed here prior to the 33d Fighter Wing being established. It was used for F-15s until the wing transitioned from Air Combat Command to Air Education and Training Command in October 2009. Replacing it will be an F-35 fuel cell maintenance hangar with three aircraft bays, office space and a tool crib. It is anticipated for completion in Feb. 2013. (U.S. Air Force photo/Maj. Karen Roganov)
Out with the old


Download Full Image
E-mail a friend
Posted: 12/16/2011


Old tower

Workers begin to move Duke Field’s old air traffic control tower toward a flat bed truck after it was taken down Dec. 3. The tower, managed by the 46th Test Wing, was continuously used in guiding in aircraft at Duke Field since the 1950s. It was replaced with a new tower this year. (U.S. Air Force photo/Samuel King Jr.)
Old tower


Download Full Image
E-mail a friend
Posted: 12/7/2011


Two towers

Just behind its new tower, Duke Field’s old air traffic control tower is lowered to the ground Dec. 3. The tower, managed by the 46th Test Wing, was continuously used in guiding in aircraft at Duke Field since the 1950s. (U.S. Air Force photo/Samuel King Jr.)
Two towers


Download Full Image
E-mail a friend
Posted: 12/7/2011


Cut thru

A welder cuts through a beam holding up the air traffic control tower at Duke Field Dec. 3. The tower, managed by the 46th Test Wing, was continuously used in guiding in aircraft at Duke Field since the 1950s. It was replaced with a new tower this year. (U.S. Air Force photo/Samuel King Jr.)
Cut thru


Download Full Image
E-mail a friend
Posted: 12/7/2011


Out with the old

Col. Sal Nodjomian, 96th Air Base Wing commander, breaks down the entry way to the old Eglin Air Force Base NCO club Oct. 15. The club will be completely removed by mid-November to make way for Navy EOD dormitories. The dorms are scheduled to be complete by Summer 2011. (U.S. Air Force photo/Samuel King Jr.)
Out with the old


Download Full Image
E-mail a friend
Posted: 10/18/2010


Staff excavator

Col. Sal Nodjomian, 96th Air Base Wing commander, drives the excavator toward the old Eglin Air Force Base NCO club prior to kicking off its demolition Oct. 15. The club will be completely removed by mid-November to make way for Navy EOD dormitories. The dorms are scheduled to be complete by Summer 2011. (U.S. Air Force photo/Samuel King Jr.)
Staff excavator


Download Full Image
E-mail a friend
Posted: 10/18/2010


Moving in

Tech. Sgt. Steve Welch, 96th Communications Squadron, begins to install the command post's giant voice system at their new location in Building 1. The command post serves as the executive agency for command and control for commanders during routine operations, emergencies, contingencies and increased readiness. The CP is a 24 hour a day, seven days a week operation that has 17 authorizations to man its shifts. (U.S. Air Force photo/Samuel King Jr.)
Moving in


Download Full Image
E-mail a friend
Posted: 9/21/2010


Runway clear

A line of asphalt was cleared by the RX-900 in February at Eglin Air Force Base, Fla. This was part of the six-month repaving and construction on Runway 19/01. The runway reopened March 15 to air traffic. (Courtesy photo.)
Runway clear


Download Full Image
E-mail a friend
Posted: 3/15/2010


Road rash

Asphalt is ground up and shot out by the RX-900 in February at Eglin Air Force Base, Fla. This was part of the six-month repaving and construction on Runway 19/01. The runway reopened March 15 to air traffic. (Courtesy photo.)
Road rash


Download Full Image
E-mail a friend
Posted: 3/15/2010


Road rash

Asphalt is ground up and shot out by the RX-900 in February at Eglin Air Force Base, Fla. This was part of the six-month repaving and construction on Runway 19/01. The runway reopened March 15 to air traffic. (Courtesy photo.)
Road rash


Download Full Image
E-mail a friend
Posted: 3/15/2010


Blue steel

EGLIN AIR FORCE BASE, Fla. -- A construction worker welds the steel frame of the Eglin Conference Center walkway canopy, Feb. 24. The canopy will receive repairs before it is recovered. (U.S. Air Force photo/ Airman 1st Class Anthony Jennings)
Blue steel


Download Full Image
E-mail a friend
Posted: 2/24/2010


Blue steel

EGLIN AIR FORCE BASE, Fla. -- A construction worker welds the steel frame of the Eglin Conference Center walkway canopy, Feb. 24. The canopy will receive repairs before it is recovered. (U.S. Air Force photo/ Airman 1st Class Anthony Jennings)
Blue steel


Download Full Image
E-mail a friend
Posted: 2/24/2010


Cutting Up

EGLIN AIR FORCE BASE, Fla. -- A construction worker cuts into the sidewalk next to Dorm 17, Feb. 24. The work will repair cracks and uneven areas of the sidewalk to improve the quality of life for personnel walking on base. (U.S. Air Force photo/ Airman 1st Class Anthony Jennings)
Cutting Up


Download Full Image
E-mail a friend
Posted: 2/24/2010


From above

Aerial view of the Joint Strike Fighter Training Center construction site. Courtesy photo.
From above


Download Full Image
E-mail a friend
Posted: 1/12/2010


Sparks fly

Sparks fly as a construction worker cuts through a piece of metal Jan. 8 at the Joint Strike Fighter Training Facility construction site. The temperatures and wind chill halted some of the construction activities Jan. 8, but work still continued. Drills, saws, raised platforms and heavy movers could be heard all around the site. (U.S. Air Force photo/Samuel King Jr.)
Sparks fly


Download Full Image
E-mail a friend
Posted: 1/11/2010


Chiller driller

A construction worker, on a raised lift, uses a drill on the right side of the Joint Strike Fighter Training Facility construction site Jan. 8. The temperatures and wind chill halted some of the construction activities Jan. 8, but work still continued. Drills, saws, raised lifts and heavy movers could be heard all around the site. (U.S. Air Force photo/Samuel King Jr.)
Chiller driller


Download Full Image
E-mail a friend
Posted: 1/11/2010


The flame

A construction worker adjusts a blowtorch before soldering Jan. 8 at the Joint Strike Fighter Training Facility construction site. The temperatures and wind chill halted some of the construction activities Jan. 8, but work still continued. Drills, saws, raised platforms and heavy movers could be heard all around the site. (U.S. Air Force photo/Samuel King Jr.)
The flame


Download Full Image
E-mail a friend
Posted: 1/11/2010


Maker's mark

John Luciano marks a pipe with a marker Jan. 8 at the Joint Strike Fighter Training Facility construction site. The temperatures and wind chill halted some of the construction activities Jan. 8, but work still continued. Drills, saws, raised lifts and heavy movers could be heard all around the site. (U.S. Air Force photo/Samuel King Jr.)
Maker's mark


Download Full Image
E-mail a friend
Posted: 1/11/2010


A bite of base housing

EGLIN AIR FORCE BASE, Fla. – An excavator demolishes a house in base housing. The demolition is part of an effort to destroy old, inadequate units to improve the quality of life for base housing residents. (U.S. Air Force photo/ Airman Anthony Jennings)
A bite of base ...


Download Full Image
E-mail a friend
Posted: 8/12/2009


Bite of base housing

EGLIN AIR FORCE BASE, Fla. – An excavator demolishes a house in base housing. The demolition is part of an effort to destroy old, inadequate units to improve the quality of life for base housing residents. (U.S. Air Force photo/ Airman Anthony Jennings)
Bite of base ...


Download Full Image
E-mail a friend
Posted: 8/12/2009


New playgrounds ready for summer fun

Children enjoy playing on the new equipment on Chinquapin Drive. Three new playgrounds are now open for children living in base housing. (USAF photo/Lois Walsh)
New playgrounds ...


Download Full Image
E-mail a friend
Posted: 6/29/2009


New playgrounds ready for summer fun

Matt Lambert enjoys climbing on the new equipment on Chinquapin Drive. Three new playgrounds are now open for children living in base housing. (USAF photo/Lois Walsh)
New playgrounds ...


Download Full Image
E-mail a friend
Posted: 6/29/2009


308 ARSW

McDonnell Douglas workers remove the packaging of a Small Diameter Bomb warhead in this 2008 photo. (Air Force photo)
308 ARSW


Download Full Image
E-mail a friend
Posted: 5/26/2009


New renovations

EGLIN AIR FORCE BASE, Fla. -- Col. Dennis Yates, 96th Civil Engineer Group commander, takes a look at the renovations made to a military family housing unit March 3. The renovations were made as part of the Super Change of Occupancy Maintenance project to upgrade the existing housing. The Department of Defense has awarded Eglin more than $1.1M to upgrade more than 420 units for SuperCOM projects, with an additional $150,000 to install three new playgrounds throughout housing. (U.S. Air Force photo by Staff Sgt. Mike Meares)
New renovations


Download Full Image
E-mail a friend
Posted: 3/3/2009


Huricane exercise

A crew from the 796th Civil Engineer Squadron installs plywood over the front entrance of the CE headquarters building. The squadron was showing its capability during the Hurricane Lynda exercise. (USAF photo by Bruce Hoffman)
Huricane ...


Download Full Image
E-mail a friend
Posted: 5/30/2008


Soundside Manor

Soundside Manor
Soundside Manor


Download Full Image
E-mail a friend
Posted: 2/19/2008


Pine Shadow

Pine Shadow
Pine Shadow


Download Full Image
E-mail a friend
Posted: 2/19/2008


Live Oak

Live Oak
Live Oak


Download Full Image
E-mail a friend
Posted: 2/19/2008


Woodland Manor (Old Plew Housing)

Woodland Manor (Old Plew Housing)
Woodland Manor ...


Download Full Image
E-mail a friend
Posted: 2/19/2008


Magnolia Manor (Poquito Bayou Housing)

Magnolia Manor (Poquito Bayou Housing)
Magnolia Manor ...


Download Full Image
E-mail a friend
Posted: 2/19/2008


Lake Side (Wherry Housing)

Lake Side (Wherry Housing)
Lake Side ...


Download Full Image
E-mail a friend
Posted: 2/19/2008


Indian Trails (Capehart Housing)

Indian Trails (Capehart Housing)
Indian Trails ...


Download Full Image
E-mail a friend
Posted: 2/19/2008


Hidden Oaks Terrace

Hidden Oaks Terrace
Hidden Oaks ...


Download Full Image
E-mail a friend
Posted: 2/19/2008


Georgia Ave

Georgia Ave
Georgia Ave


Download Full Image
E-mail a friend
Posted: 2/19/2008


Camp Rudder

Camp Rudder
Camp Rudder


Download Full Image
E-mail a friend
Posted: 2/19/2008


Ben's Lake

Ben's Lake
Ben's Lake


Download Full Image
E-mail a friend
Posted: 2/19/2008


Azalea Manor (New Plew Housing)

Azalea Manor (New Plew Housing)
Azalea Manor ...


Download Full Image
E-mail a friend
Posted: 2/19/2008


In the dark

On-base residents will experience a power outage Sept. 29 and Oct. 13 while the 796th Civil Engineer Squadron performs maintenance to the base electrical system. The power outage will begin at 7 a.m and last until 11:30 a.m. The outage is needed to change out four power poles on primary distribution circuits.
In the dark


Download Full Image
E-mail a friend
Posted: 9/12/2007


Clinic taking shape

Construction is underway at the Eglin Community Base Outpatient Clinic. The $5.2 million, 16,700 square-foot clinic is a cooperative effort between the base and the Veterans Health Care Network and is located near the 96th Medical Group's regional hospital. The clinic is projected to open in early 2008.
Clinic taking ...


Download Full Image
E-mail a friend
Posted: 3/13/2007


Soundside Manor

A photograph of a house in Eglin base housing in Soundside Manor.
Soundside Manor


Download Full Image
E-mail a friend
Posted: 1/4/2007


Live Oak Terrace

A photograph of a house in Eglin base housing at Live Oak Terrace.
Live Oak Terrace


Download Full Image
E-mail a friend
Posted: 1/4/2007


Hidden Oaks

A photograph of a house in Eglin base housing at Hidden Oaks.
Hidden Oaks


Download Full Image
E-mail a friend
Posted: 1/4/2007

    

 Inside Eglin AFB

ima cornerSearch

ima cornerCategories
All Photos
   Aircraft
   Construction
   Environmental
   Events
   Illustrations
   Other
   People
   Special Interest
   Weapons

Site Map      Contact Us     Questions     USA.gov     Security and Privacy notice     E-publishing