Triple 6 demolition
Jobe Everson, tears down Bldg. 666 with an excavator Dec. 20 at Eglin Air Force Base, Fla. The old building was used by the 96th Civil Engineer Group for many years. The entire demolition and clean up is supposed to take approximately two weeks depending on weather. (U.S. Air Force photo/Samuel King Jr.)