Photos

Keyword: Category: Tag: Sort By:
On-base residents will experience a power outage Sept. 29 and Oct. 13 while the 796th Civil Engineer Squadron performs maintenance to the base electrical system.
The power outage will begin at 7 a.m and last until 11:30 a.m. The outage is needed to change out four power poles on primary distribution circuits.


In the dark

On-base residents will experience a power outage Sept. 29 and Oct. 13 while the 796th Civil Engineer Squadron performs maintenance to the base electrical system. The power outage will begin at 7 a.m and last until 11:30 a.m. The outage is needed to change out four power poles on primary distribution circuits.

Related Imagery